[1]杨伟.福州海峡国际会展中心钢桁架施工全过程数值模拟及监控[J].地震工程与工程振动,2017,01(05):087-95.[doi:10.13197/j.eeev.2017.05.87.yangw.010]
 YANG Wei.Numerical simulation and monitoring of the whole construction process of steel truss of Fuzhou strait international convention and exhibition center[J].EARTHQUAKE ENGINEERING AND ENGINEERING DYNAMICS,2017,01(05):087-95.[doi:10.13197/j.eeev.2017.05.87.yangw.010]
点击复制

福州海峡国际会展中心钢桁架施工全过程数值模拟及监控
分享到:

《地震工程与工程振动》[ISSN:/CN:]

卷:
01
期数:
2017年05期
页码:
087-95
栏目:
论文
出版日期:
2017-10-01

文章信息/Info

Title:
Numerical simulation and monitoring of the whole construction process of steel truss of Fuzhou strait international convention and exhibition center
作者:
杨伟12
1. 福建省建筑科学研究院, 福建 福州 350025;
2. 福建省绿色建筑技术重点实验室, 福建 福州 350025
Author(s):
YANG Wei12
1. Fujian Academy of Building Research, Fuzhou 350025, China;
2. Fujian Provincial Key Laboratory of Green Building Technology, Fuzhou 350025, China
关键词:
数值模拟施工监控大跨度钢桁架
Keywords:
numerical simulationconstruction monitoringlarge spansteel truss
分类号:
TU393.3
DOI:
10.13197/j.eeev.2017.05.87.yangw.010
摘要:
对某会展中心钢桁架的施工过程进行数值模拟分析和监控。针对制定的钢桁架施工方案,采用MIDAS/GEN软件进行施工全过程数值模拟分析,以确保方案的可行性;同时对施工过程钢桁架的变形和关键受力部位的应力进行监测,以保证结构在施工过程中的安全,并验证数值模拟的准确性。测试结果表明:本工程数值模拟准确,施工方案可行,卸载后结构处于安全状态。
Abstract:
The whole construction process of steel truss of a exhibition center is simulated and monitored. According to the construction scheme of steel truss, MIDAS/GEN software was used to carry out numerical simulation analysis of the whole process of construction, in order to ensure the feasibility of the scheme. In the same time, the deformation of the steel truss and the stress of the key parts in the constructional process were monitored, in order to ensure the safety of the structure. Also, the accuracy of numerical simulation was verified. The test results show that the numerical simulation is accurate, the construction scheme is feasible, and the structure is in a safe state after unloading.

参考文献/References:

[1] 潘多忠,魏德敏. 大跨度钢结构分步施工模拟方法[J].华南理工大学学报:自然科学版,2010, 38(9):123-126. PAN Duozhong, WEI Demin. A simulation method for long span steel structure construction[J]. Journal of South China University of Technology (Natural Science Edition), 2010, 38(9):123-126.(in Chinese)
[2] 崔晓强,郭彦林,叶可明. 大跨度钢结构施工过程的结构分析方法研究[J]. 工程力学, 2006, 23(5):83-88. CUI Xiaoqiang, GUO Yanlin, YE Keming. Structural analysis method of long-span steel structure under construction[J]. Engineering Mechanics, 2006, 23(5):83-88.(in Chinese)
[3] 周建民,陈顺,常建新. 大跨度空间钢管桁架的卸载过程模拟及控制[J]. 建筑钢结构进展,2008, 10(4):14-17. ZHOU Jianmin, CHEN Shun, CHANG Jianxin. Simulation and control of unloading progress for large-span space steel pipe truss[J]. Progress in Steel Building Structure, 2008, 10(4):14-17.(in Chinese)
[4] 杨伟.福州海峡国际会展中心扩建工程东区钢桁架施工过程数值模拟[J]. 福建建筑,2015, 7:117-119. YANG Wei. Numerical simulation of construction process for eastern steel truss in extension project of Fuzhou Strait International Conference and Exhibition Center[J]. Fujian Architecture, 2015, 7:117-119.(in Chinese)
[5] 钱稼茹,张微敬,赵作周,等. 北京大学体育馆钢屋盖施工模拟与监测[J].土木工程学报, 2009, 42(9):13-20. QIAN Jiaru, ZHANG Weijing, ZHAO Zuozhou,et al. Construction simulation and monitoring of steel roof of gymnasium in Peking University[J]. China Civil Engineering Journal, 2009, 42(9):13-20.(in Chinese)
[6] 伍小平,高振锋,李子旭. 国家大剧院钢壳体施工全过程模拟分析[J]. 建筑结构学报, 2005, 26(5):40-45. WU, Xiaoping, GAO Zhenfeng, LI Zixu. The whole construction process simulation and analysis of the National Theatre[J]. Journal of Building Structures, 2005, 26(5):40-45.(in Chinese)
[7] 宋国福,王海涛,张三虎. 神华技术创新基地大跨度钢桁架施工技术[J]. 施工技术, 2011, 40(349):55-58. SONG Guofu, WANG Haitao, ZHANG Sanhu. Construction technology of long-span steel truss in Shenhua technology innovation base[J]. Construction Technology, 2011, 40(349):55-58.(in Chinese)
[8] 李太权,苏建成,邱国锋. 临沂机场航站楼钢管桁架施工技术[J]. 建筑技术,2012, 43(10):873-876. LI Taiquan, SU Jiancheng, QIU Guofeng. Construction technology of steel pipe truss for terminal building of Linyi Airport[J]. Building Technology, 2012, 43(10):873-876.(in Chinese)

相似文献/References:

[1]景立平,孟宪春,孙海峰,等.三层地铁车站振动台试验的数值模拟[J].地震工程与工程振动,2012,(01):098.
 JING Liping,MENG Xianchun,SUN Haifeng,et al.Numerical simulation of three-story subway station shaking table test[J].EARTHQUAKE ENGINEERING AND ENGINEERING DYNAMICS,2012,(05):098.
[2]宫少琦,苏荣华,代树红.逆冲断层破裂规律的相似模拟试验与数值模拟[J].地震工程与工程振动,2012,(03):028.
 GONG Shaoqi,SU Ronghua,DAI Shuhong.Similar material experiment and numerical simulation of rupture feature of thrust fault[J].EARTHQUAKE ENGINEERING AND ENGINEERING DYNAMICS,2012,(05):028.
[3]王琼,郭恩栋,杨丹,等.走滑断层位移作用下山岭隧道非线性反应分析[J].地震工程与工程振动,2010,(02):119.
 WANG Qiong,GUO Endong,YANG Dan,et al.Nonlinear analysis of mountain tunnels under strike-slip fault movement[J].EARTHQUAKE ENGINEERING AND ENGINEERING DYNAMICS,2010,(05):119.
[4]蒋录珍,陈隽,李杰.非一致地震激励地下综合管廊振动台模型试验研究(Ⅲ)——数值模拟[J].地震工程与工程振动,2010,(03):045.
 JIANG Luzhen,CHEN Jun,LI Jie.Shaking table test of utility tunnel under non-uniform seismic excitations(Ⅲ):Numerical simulation[J].EARTHQUAKE ENGINEERING AND ENGINEERING DYNAMICS,2010,(05):045.
[5]孙芳锦,张大明,殷志祥.膜结构风振中流固耦合效应的数值模拟研究[J].地震工程与工程振动,2010,(03):136.
 SUN Fangjin,ZHANG Daming,YIN Zhixiang.Numerical simulation of fluid-structure interaction in wind-induced vibration of membrane structures[J].EARTHQUAKE ENGINEERING AND ENGINEERING DYNAMICS,2010,(05):136.
[6]孙有为,薄景山,李平,等.地震对地下硐室围岩动压力的影响[J].地震工程与工程振动,2010,(03):171.
 SUN Youwei,BO Jingshan,LI Ping,et al.Influence of earthquake on rock dynamic pressure of underground chambers[J].EARTHQUAKE ENGINEERING AND ENGINEERING DYNAMICS,2010,(05):171.
[7]马新生,谢志南,王延伟,等.高性能集群系统在地震波数值模拟中的应用[J].地震工程与工程振动,2010,(06):053.
 MA Xinsheng,XIE Zhinan,WANG Yanwei,et al.Application of high-performance cluster system in numerical simulation of seismic waves[J].EARTHQUAKE ENGINEERING AND ENGINEERING DYNAMICS,2010,(05):053.
[8]师燕超,李忠献.高应变率下再生橡胶颗粒改性混凝土受压破坏细观数值模拟[J].地震工程与工程振动,2010,(06):098.
 SHI Yanchao LI Zhongxian.Numerical modeling of compressive behavior of recycled rubber-filled concrete at high strain rates[J].EARTHQUAKE ENGINEERING AND ENGINEERING DYNAMICS,2010,(05):098.
[9]孙海峰,景立平,孟宪春,等.ABAQUS中动力问题边界条件的选取[J].地震工程与工程振动,2011,(03):071.
 SUN Haifeng,JING Liping,MENG Xianchun,et al.The selection of boundary conditions in dynamic problems by using ABAQUS[J].EARTHQUAKE ENGINEERING AND ENGINEERING DYNAMICS,2011,(05):071.
[10]张华,彭天波,李建中,等.FRP橡胶支座压缩性能分析[J].地震工程与工程振动,2011,(03):154.
 ZHANG Hua,PENG Tianbo,LI Jianzhong,et al.Study on compression performance of FRP rubber bearing[J].EARTHQUAKE ENGINEERING AND ENGINEERING DYNAMICS,2011,(05):154.

备注/Memo

备注/Memo:
收稿日期:2016-10-25;改回日期:2017-01-15。
基金项目:国家自然科学基金青年科学基金项目(51308226)
作者简介:杨伟(1979-),男,高级工程师,博士,主要从事工程结构抗震、减隔震分析和结构健康监测研究.E-mail:ywluck@qq.com
更新日期/Last Update: 2017-10-25