参考文献/References:
[1] 贾金河,于亚伦. 国外拆除爆破的现状[J]. 爆破,1998, 15(2):37-41. JIA Jinhe, YU Yalun. Recent development of explosive demolition abroad[J]. Blasting, 1998, 15(2):37-41.(in Chinese)
[2] 徐书雷,郑学召,王小林,等. 浅述国内外拆除爆破现状[J]. 爆破, 2003, 20(2):20-23. XU Shulei, ZHENG Xuezhao, WANG Xiaolin, et al. Brief description about current situation of demolition blasting at home and abroad[J]. Blasting, 2003, 20(2):20-23.(in Chinese)
[3] 谢先启. 拆除爆破数值模拟与应用[M]. 武汉:湖北科学技术出版社, 2008. XIE Xianqi. Numerical methods and their applications on demolition blasting[M]. Wuhan:Hubei Sciene & Techndogy Press, 2008.(in Chinese)
[4] Huang W, Grould P L, 3D Pushover Analysis of A Collapsed Reinforced Concrete Chimney. Finite Elem. Anal. Des. (2007), doi:10.1016/j. Finel, 2007.
[5] 周家汉. 爆破拆除塌落振动速度计算公式的讨论[J]. 工程爆破, 2009, 15(1):1-5. ZHOU Jiahan. Discussion on calculation formula of collapsing vibration velocity caused by blasting demolition[J]. Engineering Blasting, 2009, 15(1):1-5. (in Chinese)
[6] 钟明寿,龙源,谢全民,等. 龙海大厦拆除爆破塌落振动与爆破振动的对比分析[J]. 工程爆破, 2009, 15(4):58-61. ZHONG Mingshou, LONG Yuan, XIE Quanmin, et al. Comparative analysis of collapse vibration and blasting vibration based on demolition blasting of Longhai building[J]. Engineering Blasting, 2009, 15(4):58-61.(in Chinese)
[7] 费鸿禄,张龙飞,杨智广. 拆除爆破塌落振动频率预测及其回归分析[J]. 爆破, 2014, 31(3):28-31. FEI Honglu, ZHANG Longfei, YANG Zhiguang. Forecast of collapse vibration frequency of demolition blasting and its regression analysis[J]. Blasting, 2014, 31(3):28-31.(in Chinese)
[8] 徐鹏飞,褚怀保,张英才. 冷却塔在高卸荷槽切口下爆破拆除振动数值分析[J]. 工程爆破, 2014, 20(4):11-14. XU Pengfei, CHU Huaibao, ZHANG Yingcai. Vibration numerical analysis of cooling tower blasting at high unloading slot incision[J]. Engineering Blasting, 2014, 20(4):11-14.(in Chinese)
[9] 李明. 大型高架桥爆破拆除塌落触地对地面振动影响分析[J]. 路基工程, 2016(2):175-178. LI Ming. Analysis of the inpact of collapse vibration caused by blasting demolition of a large viaduct[J]. Subgrade Engineering, 2016(2):175-178.(in Chinese)
[10] Kimm H S, Ahn J G, Ahn H S. Computational simulation of progressive collapse of reinforced concrete rigid frame with reinforcement contact model[J]. Advances in Structural Engineering, 2016,19(6):982-994.
[11] 孙金山,谢先启,贾永胜,等. 建(构)筑物拆除爆破塌落触地振动预测模型研究[J]. 工程爆破, 2014, 20(2):25-28. SUN Jinshan, XIE Xianqi, JIA Yongsheng, et al. Forecast model of peak vibration velocity induced by the collapse of structure in demolition blasting projects[J]. Engineering blasting, 2014, 20(2):25-28.(in Chinese)
[12] GB-6722-2014爆破安全规程[S]. 北京:中国标准出版社,2015. GB-6722-2014 Safety Regulations for Blasting[S]. Beijing:China Standard Press,2015.(in Chinese)
[13] 武汉爆破有限公司. 武汉大学工学部第1教学楼爆破拆除技术设计与施工组织设计[R]. 武汉:武汉爆破有限公司,2016. Wuhan Explosion & Blasting Co,Ltd. Technical design and constrution organization design of blasting demolition of Wuhan Vniversity No.1 Teaching Butlding[R]. Wuhan:Wuhan Explosion & Blasting Co,Ltd,2016.(in Chinese)