大跨度公铁两用斜拉桥群桩基础地震响应研究
分享到:

《地震工程与工程振动》[ISSN:/CN:]

卷:
39
期数:
2019年02
页码:
233-239
栏目:
论文
出版日期:
2019-04-30

文章信息/Info

Title:
Research on seismic response of pile group foundation for long span rail-cum-road cable-stayed bridge
作者:
阮怀圣
中铁大桥勘测设计院集团有限公司, 湖北 武汉 430056
Author(s):
RUAN Huaisheng
China Railway Major Bridge Reconnaissance & Design Institute Co., Ltd., Wuhan 430056, China
关键词:
公铁两用斜拉桥群桩基础高桩承台地震响应特征
Keywords:
rail-cum-road cable-stayed bridgepile group foundationhigh pile capseismic responsecharacteristics
分类号:
U448.27;TU311.3
DOI:
10.13197/j.eeev.2019.02.233.ruanhs.025
摘要:
为了解大跨度公铁两用斜拉桥群桩基础的地震响应行为,总结了该类桥梁基础的总体结构特征,探讨了基础的抗震分析模型,提出了估计高桩承台基础地震响应的实用性方法,分析了该类型基础的抗震安全度和地震响应特征。研究表明:承台等效振型参与度大小与地震动长周期成分的频谱特性有关,当忽略该因素影响时其取值分布较为平稳;E2与E1地震作用下桩基抗震安全度的比值平均大小为0.65左右;高桩承台基础最不利位置一般在桩头处,且通常表现为大偏心受压;一般冲刷线以上桩身内力呈线性分布;自一般冲刷线以下,桩身轴力基本保持不变,剪力和弯矩呈先增大后减小的曲线分布规律。
Abstract:
In order to understand the seismic response behavior of group pile foundation for long span rail-cum-road cable-stayed bridge, the general structural characteristics of this foundation are summarized in the present reseach. Besides, the basic seismic analysis model is discussed, and the practical method for estimating seismic response of high pile cap foundation is proposed. In the end, the seismic safety and seismic response characteristics of the foundation are analyzed. The results shows that the participation degree of the equivalent vibration type of the cap is related to the frequency spectrum characteristic of the long period component in earthquake. In addition, distribution of the participation degree value is relatively stable when ignoring the influence of the factor. The average ratio of aseismic safety of piles under the level of E2 to that of E1 is about 0.65. Usually the most unfavorable position of the high pile cap foundation is thought as the pile head which has a characteristic of large eccentric compression. The internal force of the pile body above the general scour line is linearly distributed, and the axial force of the pile body remained the same value as that of the general scour line, and the shear and bending moment increased first and then decreased.

参考文献/References:

[1] 马坤全, 易鹏, 吴定俊. 大跨度公铁两用斜拉桥结构特性分析[J].同济大学学报:自然科学版, 2003, 31(4):395-399. MA Kunquan, YI Peng, WU Dingjun.Analysis of structural characteristics of long span combined road with railway cable-stayed bridges[J].Journal of Tongji University:Natural Science, 2003, 31(4):395-399. (in Chinese)
[2] 秦顺全, 高宗余, 潘东发. 武汉天兴洲公铁两用长江大桥关键技术研究[J].桥梁建设, 2007(1):1-4, 20. QIN Shunquan, GAO Zongyu, PAN Dongfa. Research of key techniques for Wuhan Tianxingzhou Changjiang River rail-cum-road bridge[J].Bridge Construction, 2007(1):1-4, 20. (in Chinese)
[3] 蒋彧. 大跨径钢桁斜拉桥力学行为分析[D].重庆:重庆交通大学, 2012. JIANG Yu. Mechanical behavior analysis of long-span steel truss cable-stayed bridge[D]. Chongqing:Chongqing Jiaotong University, 2012. (in Chinese)
[4] 刘伟岸. 大型高桩承台基础的地震反应分析[D].上海:同济大学, 2007. LIU Weian.Seismic response analysis of large elevated pile foundation[D].Shanghai:Tongji University, 2007.(in Chinese)
[5] 阮怀圣, 屈爱平, 何友娣, 等. 大跨度公铁两用钢桁梁斜拉桥结构地震响应特征研究[J].桥梁建设, 2015, 44(2):34-39. RUAN Huaisheng, QU Aiping, HE Youdi. Research on structural seismic response characteristics of large-span steel truss girder rail-cum-road cable-stayed bridge[J]. Bridge Construction, 2015, 44(3):34-39.(in Chinese)
[6] 贡人非, 郭恩栋, 刘智, 等.高速铁路车桥耦合系统自振特性分析[J].地震工程与工程振动, 2014, 34(增刊1):616-622. GONG Renfei, GUO Endong, LIU Zhi, et al. The natural vibration characteristic analysis of high-speed railway bridge and train coupling system[J]. Earthquake Engineering and Engineering Dynamics, 2014, 34(S1):616-622.(in Chinese)
[7] 周敉, 袁万城, 张玥. 高桩承台基础群桩等效嵌固长度参数分析[J].长安大学学报:自然科学版, 2010, 30(3):47-52. ZHOU Mi, YUAN Wancheng, ZHANG Yue. Parameter sensitivity analysis of equivalent anchorage length for elevated pile caps[J]. Journal of Chang’an University:Natural Science Edition, 2010, 30(3):47-52.(in Chinese)
[8] 阮怀圣, 等. 大跨度斜拉桥抗震性能分析与减震优化技术[R].中国铁路工程总公司科学技术成果, 2015. RUAN Huaisheng. Seismic performance analysis and damping optimization techniques of Long span cable-stayed bridge[R]. Scientific and Technological Achievements of Chinese Railway Engineering Corporation, 2015.(in Chinese)
[9] 高新文.地震作用下可液化土层水平受荷桩基力学响应分析[J].地震工程与工程振动, 2016, 36(3):102-110. GAO Xinwen.Mechanical response of horizontal loaded pile in liquefiable soil under earthquake load[J]. Earthquake Engineering and Engineering Dynamics, 2016, 36(3):102-110.(in Chinese)
[10] 李洪江, 刘松玉, 童立元.基于应力增量的单桩p-y曲线分析方法[J].岩土力学, 2017, 38(10):2916-2922, 2930. LI Hongjiang, LIU Songyu, TONG Liyuan. A method for p-y curve of a single pile based on stress increment[J]. Rock and Soil Mechanics, 2017, 38(10):2916-2922, 2930. in Chinese)
[11] 夏修身, 戴胜勇, 刘尊稳.大跨度拱桥抗震概念设计方法[J].地震工程与工程振动, 2017, 37(2):90-96. XIA Xiushen, DAI Shengyong, LIU Zunwen. Conceptual seismic design of long-span arch bridges[J]. Earthquake Engineering and Engineering Dynamics, 2017, 37(2):90-96.(in Chinese)
[12] 赫中营, 叶爱君.群桩效应对砂土地基中高桩承台群桩基础抗震性能的影响[J].土木工程学报, 2014, 47(1):117-126. HE Zhongying, YE Aijun.Influence of group effecton the seismic performance of elevated pile-cap foundation in sand[J].China Civil Engineering Journal, 2014, 47(1):117-126.(in Chinese)

相似文献/References:

[1]姜忻良,李岳.通过群桩-土-偏心结构振动台试验分析群桩与地基的响应[J].地震工程与工程振动,2010,30(06):168.
 JIANG Xinliang,LI Yue.Response analysis of group pile and foundation by using shaking table test on pile groups-soil-eccentric structure interaction system[J].EARTHQUAKE ENGINEERING AND ENGINEERING DYNAMICS,2010,30(02):168.
[2]陈国兴,白德贵,王志华.考虑波流影响的深水群桩基础桥墩地震反应分析[J].地震工程与工程振动,2008,28(05):170.
 CHEN Guoxing,BAI Degui,WANG Zhihua.Seismic response analysis of large scale bridge pier supported by pile foundation considering the effect of wave and current action[J].EARTHQUAKE ENGINEERING AND ENGINEERING DYNAMICS,2008,28(02):170.

备注/Memo

备注/Memo:
收稿日期:2018-6-24;改回日期:2018-9-11。
基金项目:中国工程院重点咨询研究项目(2016-XZ-13);中铁大桥勘测设计院集团有限公司重点课题(2014-16)
作者简介:阮怀圣(1982-),男,高级工程师,主要从事桥梁抗震设计与研究.E-mail:ranghs@163.com
更新日期/Last Update: 1900-01-01